The Chesterfield Canal is a narrow canal in the East Midlands of England and it is known locally as 'Cuckoo Dyke'. It was one of the last of the canals designed by James Brindley, who died while it was being constructed. It was opened in 1777 and ran for from the River Trent at West Stockwith, Nottinghamshire to Chesterfield, Derbyshire, passing through the Norwood Tunnel at Kiveton Park, at the time one of the longest tunnels on the British canal system. The canal was built to export coal, limestone, and lead from Derbyshire, iron from Chesterfield, and corn, deals, timber, groceries and general merchandise into Derbyshire. The stone for the Palace of Westminster was quarried in North Anston, Rotherham, and transported via the canal.

It was reasonably profitable, paying dividends from 1789, and with the coming of the railways, some of the proprietors formed a railway company. It became part of the Manchester, Sheffield and Lincolnshire Railway company, and although there were intermittent plans to convert parts of it to a railway, it continued to thrive as a canal. In 1907, subsidence from local coal mines caused the collapse of the Norwood Tunnel, and the canal was effectively split in two. Subsequently, the main use of the Chesterfield end was the supply of water to the iron industry, while commercial carrying continued on the Worksop to West Stockwith section until the late 1950s.

It was formally closed in 1961, but campaigners fought for it to be retained, and the Worksop to Stockwith section was designated as a "cruiseway" under the Transport Act 1968, meaning that it would be retained for leisure use. The rest was designated as a remainder waterway, and parts were sold off, with housing being built over the route through Killamarsh. The Chesterfield Canal Society was formed in 1978 to spearhead restoration, becoming the Chesterfield Canal Trust in 1997. They initially sought to extend the navigable section beyond Worksop, but when progress was slow, moved to working on the Chesterfield end. Over of canal, including five original locks and a brand new lock at Staveley Basin were navigable by 2017. The eastern end was restored from Worksop to the mouth of the Norwood Tunnel at Kiveton Park near Rotherham, South Yorkshire, between 1995 and 2003, funded by Derelict Land Grants, English Partnerships and the Heritage Lottery Fund.

Less than of the original route remain to be restored to link the two navigable sections, but this will require some new lengths of canal to be built, to bypass the housing development at Killamarsh, and to replace most of the Norwood Tunnel, which cannot be restored. The eastern section is managed by the Canal and River Trust, while the western section is managed by Derbyshire County Council. It includes Tapton Lock Visitor Centre, located to the north of Tapton Park, and the Hollingwood Hub, which provides offices for the Trust, together with meeting rooms and a cafe. It is located by Hollingwood Lock, and consists of a large new extension on the back of the refurbished lock house.

History

Lead had been mined in Derbyshire on a commercial scale since at least 1300, but the industry was hampered by poor transport links. The pigs of lead were carried by pack horses to Bawtry, where there were wharves on the River Idle. Small boats carried them to the River Trent, where the cargo was transferred to larger vessels for onward distribution. There was no proper system of road maintenance, and so the use of carts and wagons for the over-land journey was not possible. The River Idle was also unreliable, being affected by floods and droughts, but there were no alternatives, and the industry flourished despite the difficulties. The Derwent Navigation was authorised in 1719, running from Derby to the River Trent, but it was less reliable than the Idle, and so did not seriously affect trade through Bawtry. The London Lead Company, one of the main traders, together with others involved in lead and coal mining, looked for possible solutions, and were joined in this by several prominent landowners.

The main impetus for a canal came from the owners of mineral rights. The London Lead Company met with the Duke of Devonshire, the Duke of Newcastle, and others, but proposals were actively supported by the towns of Chesterfield, Worksop and Retford. Retford had obtained an act of Parliament, the Idle Navigation Act 1719 (6 Geo. 1. c. 30), to improve the River Idle from Bawtry to the town, but very little work was done to implement the scheme. In addition to being a market town, Retford also manufactured bricks and tiles, had reserves of gravel, and produced an agricultural surplus. In 1769, a steering group produced a pamphlet extolling the advantages of a proposed canal, which was available to everyone, but was primarily addressed to the Duke of Newcastle, Lord George Augustus Cavendish, and the Member of Parliament (MP) for Derbyshire, Godfrey Bagnall Clarke.

The route of the canal was surveyed by James Brindley and John Varley, who estimated the cost at £94,908 17s. Brindley presented his proposals to a meeting in Worksop on 24 August 1769. Bawtry interests asked John Grundy to carry out a second survey. He proposed a rather shorter course, from Stockwith in a straight line to Bawtry and then by Scrooby, Blyth and Carlton, to join Brindley's line at Shireoaks. Grundy's line was shorter, and the cost estimated at £71,479 6s d. Although Grundy's line was considerably cheaper, it achieved this by missing Worksop and Retford, and the investors had already decided in favour of Brindley's route.

An application was made to Parliament and the act of Parliament, the (11 Geo. 3. c. 75) was given royal assent on 28 March 1771, entitled An Act for making a navigable Cut or Canal from Chesterfield, in the county of Derby, through or near Worksop and Retford, to join the River Trent, at or near Stockwith, in the county of Nottingham.

The promoters consisted of one hundred and seventy-four persons, amongst whom were the Duke of Devonshire, the Duke of Newcastle, Lord Scarsdale, the Dean of York, and Sir Cecil Wray. They were incorporated by the name of The Company of Proprietors of the Canal Navigation from Chesterfield to the River Trent, and empowered to raise among themselves the sum of £100,000, in one thousand shares of £100 each, to fund the construction.

Immediately on the passing of the act, construction began under the direction of Brindley. Upon his death in September 1772, John Varley moved from Clerk of Works to Resident Engineer with Hugh Henshall, Brindley's brother-in-law, appointed in a consultative capacity. He agreed to make inspections every three months. Henshall became Chief Engineer in 1773 and John Varley continued to work on the project. By August 1773, the section between Shireoaks and Worksop was nearly complete, and the company created a works to build boats at Shireoaks. The boats were used to carry spoil from the construction, and also to deliver coal. The canal was effectively open from Shireoaks to below Worksop by 6 April 1774, and to Retford by 3 August. The price of coal to the residents of Retford dropped from 15s 6d (77.5p) to 10s 6d (52.5p) overnight. Hayton was reached on 22 February 1775, and the Norwood Tunnel opened on 9 May 1775. The canal was to be built as a narrow canal, but in 1775, nine shareholders offered to fund the extra cost of making it a broad canal from Retford to Stockwith. Retford Corporation joined them, and each contributed £500, although the additional cost exceeded the £6,000 subscribed. The canal was opened throughout on 4 June 1777, with the lock into the River Trent at West Stockwith completed in the autumn, but the only record of wide-beamed boats using it at Retford is prior to 1799.Stamford Mercury 12 July 1799, column 3.

Operation As built, the canal was almost long, being from the Trent to Worksop with a rise of . From Worksop to the eastern portal of Norwood Tunnel it was with a further rise. From there to Chesterfield it was a further with a fall of followed by a rise of . There were 65 locks in all, with two tunnels: a short tunnel near Gringley Beacon,Chesterfield Canal map and elevations, Chesterfield Canal Society and the major long Norwood Tunnel. At the time of construction, Norwood Tunnel was the second longest canal tunnel in Britain, exceeded only by another of Brindley's tunnels, that at Harecastle on the Trent and Mersey Canal. The canal was a typical Brindley contour canal, following the contours to avoid costly cuttings and embankments, which resulted in a less than direct route in places.

In late 1775, the company had decided to build a branch, which left the canal between Renishaw and Staveley, and ran generally southwards for about to the turnpike road at Norbriggs. This may have been to help with transport to Chesterfield, until the main line was completed, but in 1777, the company leased Norbriggs Colliery. Henshall supervised its operation, and transport of coal to the branch canal was improved by the provision of a "Newcastle Rail Road" in 1778, which used wooden rails. The company pulled out of running the mine in 1797, when they advertised it to be let. Water supply was initially by a reservoir at Pebley, which was later supplemented by reservoirs at Harthill, Woodall and Killamarsh. Near Worksop, a private branch was built to serve the Lady Lee quarry, which ran for about , while at Netherthorpe, a branch connected to the East Inkersall tramroad, which served pits near the Adelphi Canal. A gasworks was later built at the junction, and while the 1877 Ordnance Survey map shows a short stub of the branch, connecting to the Seymour and Speedwell Branch railway, by 1898 a railway siding had replaced it, leaving just a basin at the junction to serve the gasworks.Ordnance Survey, 1:2,500 map, 1877 and 1898 Another private branch was built in 1840, which crossed the Norbriggs road at Netherthorpe to serve the Speedwell Colliery. It was built by the Barrows, who also owned Staveley ironworks, but by 1860 had been replaced by a railway.

By 1789, the company had spent a total of £152,400, raised through shares and by mortgages. Income for the year was £8,320, and after interest payments had been met, that left a net profit of £2,780, enabling them to make their first dividend payment of one per cent. 74,312 tons of traffic were carried that year, of which 42,380 tons were coal, with the rest consisting of lead, iron, stone, corn, lime, timber and sundries. Dividends had risen to five per cent by 1795, were eight per cent the following year, and were six or seven per cent until at least 1836. There were several suggestions for links to the River Don Navigation or the Sheffield Canal, the first in 1792 as part of the scheme to build a canal to Sheffield, and subsequently in 1824, as part of the Grand Commercial Canal. In 1852 a Sheffield and Chesterfield Junction Canal was proposed, but none of these schemes moved past the planning stage.

Railway age