The Mariazell Railway () is an electrically operated narrow-gauge railway which connects the Lower Austrian capital of Sankt Pölten with the Styrian pilgrimage centre of Mariazell. The line was opened in stages between 1898 and 1907, and had a, now closed, branch to Wieselburg an der Erlauf. The railway is operated by NÖVOG, which is owned by the provincial government, and is a part of the Verkehrsverbund Niederösterreich-Burgenland (Lower Austria and Burgenland Transport Association).

History Building and Steam Operation

The pilgrimage center of Mariazell was one of Austria-Hungary's most visited places by foreigners in the 19th century. Much thought was already being given to building a railway from St. Pölten to Mariazell even at the time when the Westbahn, from Vienna to Linz via St. Pölten opened in 1858. Many variations on the idea of extending the standard-gauge line through the Lower Austrian foothills of the Alps were considered.

Only after the Lower Austrian State Railway Law was passed in 1895 did work begin on the project. Owing to the difficult terrain that the railway would have to cross, it was decided to build it to a narrow gauge. The gauge of , as with all narrow-gauge railway undertakings in the Danube Monarchy, was made necessary by the military administration. Rolling stock used in military service on railways in Bosnia and Hercegovina was gauge and would need to be brought in. The railway's alignment would be built to a minimum curve radius of 80 m. In 1896, building work by the Lower Austrian State Railway Office began with acting director Engineer Josef Fogowitz in charge.

The mainline from St. Pölten to Kirchberg and the branch to Mank were opened on 4 July 1898; the operators were the state's own Lower Austrian State Railways. For the opening of these lines, the Lower Austrian State Railways bought four U Series steam locomotives, already proven on the Murtalbahn. The locomotives along with the two-axle passenger coaches and goods wagons, which were customary at the time, formed the railway network's basic equipment. The fleet was filled out in 1903 by two-axle light steam-powered railcars, which took over less-used trains.

As of 1902, building was continued and in 1905, the stretch through the Pielach valley as far as Laubenbachmühle and the branchline extension to Ruprechtshofen were completed. For the opening of this extension, and in anticipation of the further extension (the "mountain line") to Mariazell, a compound steam engine and a superheated steam engine were acquired as further developments of the U series.

In 1906, the Mariazell extension was sufficiently complete for freight traffic to be worked through to the terminus. On 2 May 1907, passenger service to Mariazell began running. That same summer, the final main line extension to Gußwerk was brought into service. For the mountainous extension to Mariazell, an especially high-performance engine was needed. The Krauss locomotive works in Linz proposed to build a locomotive with four powered axles and a tender, four of which were built by 1906 and used superheated steam. They were designated Mh (nowadays ÖBB 399). In 1907, two locomotives with compound steam workings were acquired and designated Mv. The "h" stood for "Heißdampf" (superheated steam), and the "v" for "Verbundantrieb" (compound working). Since the latter locomotives did not prove their worth, the next order was for two further locomotives of the Mh series. Since many passengers were expected, a great number of four-axled passenger coaches were bought, which were comparable in comfort and accoutrements with contemporary standard-gauge coaches. Also in 1906, three bigger and stronger steam railcars were delivered.

The "Lower Austrian-Styrian Alp Railway" (Niederösterreichisch-Steirische Alpenbahn) as the railway was known in Austro-Hungarian officialese, was thereby complete. Far-reaching plans for an extension over the Styrian Seeberg and a connection with the likewise narrow-gauge Thörlerbahn, and thereby with the Styrian railway network, had no work done on them owing to the outbreak of the First World War. Also, a connection to the Ybbstalbahn was never built.

Once open, the rush of passengers was so great that for a time, the railway did not even bother with advertising. Among the various kinds of freight carried on the railway were agricultural products, ores from local mines, and wood from the heavily forested mountain region. Wood remained the most important kind of goods on the Mariazell Railway right up until freight operations were discontinued. As early as 1909, standard-gauge goods wagons were being transported along the Mariazellerbahn on transporter wagons, insofar as the railway's narrow loading gauge would allow it.

Electrification

It quickly became apparent that the series Mh and Mv locomotives were not adequate for the traffic on offer. Several scenarios for raising the railway's performance were considered, among them double-tracking and the acquisition of an even stronger type of steam locomotive. At this time, the acting director of the State Railway Office, Engineer Eduard Engelmann jr., brought forth the suggestion that the Mariazell Railway be electrified using single-phase alternating current.

This suggestion was said to be revolutionary. There had never been a railway line of such length meant to handle mainline traffic that had been electrically operated. The only electric traction at this time was to be found on tramways and light, local railways, which used only direct current (DC) throughout. Only the tram-like Stubaitalbahn in Tyrol, built in 1904, was using alternating current (AC). Despite great opposition, Engelmann managed to implement his vision. So, the Mariazell Railway was electrified between 1907 and 1911, making use of the mountainous region's vast hydroelectric resources.

Once electrification began in 1911, 16 E series locomotives (still used today as ÖBB 1099) were delivered between 1909 and 1914. Thereafter, steam trains disappeared from the main line after only five years. All the steam railcars were sold, and most of the steam locomotives remained on the still unelectrified branch line. A few were sent to the Waldviertler Schmalspurbahnen.

By implementing their intentions, many unprecedented concepts were realized. The experience garnered from the electrification proved to be the benchmark for later projects of the same kind. Unlike tramway electrification, the wires were hung using massive wire gantries and steel masts. Also, the locomotive design with two separate powered bogies is widespread today. The power stations, necessary for the electrical supply, were built under very difficult conditions in the mountainous landscape. They were also used to supply the region with electricity, thereby laying the groundwork for the Lower Austrian state energy company NEWAG, now known as EVN.

From the First World War until 1945 During the First World War, quite a number of steam locomotives and a great number of wagons were temporarily confiscated for wartime duty, among them the locomotives Mh.1 to Mh.5. The last one was returned from Sarajevo in 1920.

The branch line from Ober-Grafendorf to Ruprechtshofen, after building had been interrupted by the war, was extended to Gresten in 1927 but not electrified. All other expansion projects, even though some were still being discussed even after 1945, were never realized. With the extension of the branchline to Gresten came new P and Uh series steam locomotives (ÖBB 199 and 498, respectively).

In 1922, the Bundesbahn Österreich (BBÖ) took over the Mariazell Railway from the , which had fallen into financial difficulties.

The first diesel locomotive was tested on the line in the 1930s. This type, later described as ÖBB 2190, was only suited for light passenger trains. The self-powered luggage railcars (series 2041 or ÖBB 2091) were slightly better in performance.

After Anschluss in 1938, the narrow-gauge railway, like all Austrian railways, became part of the Deutsche Reichsbahn. During the wartime years 1944 and 1945, there was wartime destruction and damage in many places, especially around St. Pölten.

After 1945

After the Second World War, the former State Railway lines became part of the Österreichische Bundesbahnen (ÖBB). The rolling stock was given a new number scheme in 1953. In the following years, there were some alignment corrections on the line. That, and the rebuilding of the rolling stock in the 1950s and 1960s, as well as the changeover to diesel working on the branch line were the furthest-reaching modernization measures undertaken on the railway. Between 1959 and 1962, the original electric locomotives, now known as ÖBB class 1099, were given new, more modern style, bodies, whilst retaining the same traction equipment. The passenger coaches were likewise provided with matching steel bodies. In 1962, the steam engines were replaced by new diesel locomotives, of ÖBB class 2095. The series 399 locomotives went to the Waldviertler Schmalspurbahnen, whilst the remaining steam locomotives were withdrawn from service.

In 1981, a speeding train derailed on Buchberggraben viaduct, killing the driver. The locomotive involved (ÖBB 1099.015) was scrapped at the site and was the only one to have such an big incident.

In 1984, the last Rollböcke, the more primitive type of transporter wagon using forks to hold the standard-gauge wagon's axles, were replaced with Rollwagen, the more advanced type resembling a wagon with a short stretch of standard-gauge track onto which the standard-gauge wagon is fastened.

In 1994, two newly developed electric multiple unit (EMU) trains (ÖBB class 4090) were acquired. One had 2 Railcars with 2 sidecars, the other one had a Railcar, sidecar & Control Car. In 1995, these were supplemented by some diesel railcars (ÖBB class 5090) for use on lighter loaded services and on the branch line.

In the wave of secondary-railway abandonments in Lower Austria, even the Mariazell Railway was affected. Freight traffic using narrow-gauge wagons on the Mountain Line was completely given up, and the short stretch of line between Mariazell and Gußwerk was abandoned in 1988. Freight service still continued for a few years as far as Schwarzenbach an der Pielach after it had been discontinued to Mariazell, but it was limited to wood carried in narrow-gauge wagons. On 31 December 1998, ÖBB ended transporter wagon service on the Valley Line and the remaining section of the branchline, thereby ending all freight service on the Mariazell Railway.

Passenger traffic on the branch slowly diminished. The line from Wieselburg to Gresten was converted from narrow-gauge to standard gauge in 1998 due to extensive freight operations, discontinuing passenger operations. Before then, the standard-gauge goods wagons were loaded onto transporter wagons in Wieselburg for the trip along this stretch of line. In connection with this gauge conversion, passenger service on the line east of Wieselburg to Ruprechtshofen was discontinued in 2001, followed by the discontinuation of service between Mank and Ruprechtshofen in 2003. Service on the last section of the branch line, between Ober Grafendorf and Mank, ceased in 2010, when the line closed completely.

As of about 2000, the ÖBB was considering selling or abandoning the main line between St. Pölten and Mariazell. In the autumn of 2003, a plan was drawn up to convert the line between St. Pölten and Kirchberg an der Pielach to standard gauge, as this stretch was considered important for commuters and school children. However neither plan was carried out, and the ÖBB continued to provide narrow gauge service on the main line up to the transfer of the line in 2010.

Back to provincial ownership