The Stormwater Management And Road Tunnel (SMART Tunnel), E38, is a storm drainage and road structure in Kuala Lumpur, Malaysia, and a major national project in the country. The tunnel is the longest stormwater drainage tunnel in Southeast Asia and second longest in Asia.
The main objective of this tunnel is to solve the problem of flash floods in Kuala Lumpur and to reduce traffic jams along Jalan Sungai Besi and Loke Yew flyover at Pudu during rush hour. There are two components of this tunnel, the stormwater tunnel and motorway tunnel. It is the longest multi-purpose tunnel in the world.
In 2011, the SMART tunnel received the UN Habitat Scroll of Honour Award for its innovative and unique management of storm water and peak hour traffic.
It begins at Kampung Berembang lake near Klang River at Ampang and ends at Taman Desa lake near Kerayong River at Salak South. The project is led by the government, including Malaysian Highway Authority (Lembaga Lebuhraya Malaysia, LLM) and the Department of Irrigation and Drainage Malaysia (Jabatan Pengairan dan Saliran, JPS) and also a company joint venture pact between Gamuda Berhad and MMC Corporation Berhad (MMC).
Route background The Kilometre Zero of the tunnel is located at Salak Interchange.
History In 2001 the Government sought proposals for a solution that would allow a typical flood of three to six hours' duration to occur without flooding the city centre. A tunnel that would allow floods to bypass the centre was one way of achieving this, providing it was coupled with temporary storage facilities to keep flows downstream of Kuala Lumpur within the capacity of the river channel. A group led by Gamuda engaged SSP, a large Malaysian consultant engineering firm, and Mott MacDonald UK to develop proposals for a tunnel with holding ponds at upstream and downstream ends of the tunnel.
Construction of the tunnel began on 25 November 2003. Two Herrenknecht Tunnel Boring Machines (TBM) from Germany were used, including Tuah on north side and Gemilang on south side. Gusztáv Klados was the senior project manager of the project.THE ROLE OF GUSZTÁV KLADOS
On 11 December 2003, the 13.2-m diameter Mixshield TBM, Tuah, completed a 737-m section after 24 weeks of excavation. By the end of January 2004, Tuah would start a second drive covering a distance of 4.5 km to Kampung Berembang lake. The motorway sections on the SMART system was officially opened at 3:00PM, 14 May 2007, after multiple delays.Utusan Malaysia Online - Berita UtamaMalaysian National News Agency :: BERNAMA
Meanwhile, the stormwater sections on the SMART system began operations at the end of January 2007.
By 18 July 2010 the SMART system had prevented seven potentially disastrous flash floods in the city centre, having entered its first mode 3 operation only weeks after the opening of the motorway.MegaStructures SMART tunnel episode
As of September 2020, the tunnel had activated its fourth mode for the seventh time. During the flash flood on 10 September 2020, the tunnel diverted three million cubic metres of water.
In December 2021, SMART entered Mode 4 for an eighth time, due to the massive flooding caused by heavy rainfall lasting from 16 to 18 December. The tunnel was again activated and spared the center of Kuala Lumpur from a potentially catastrophic flood, having successfully diverted 5 million cubic metres of flood water during the 22 hours it was on full activation.
In 2022, the government was considering the proposal to build another tunnel, briefly known as SMART 2, to cater for high density flood-prone area such as Shah Alam.
Functioning
Mode 1 The first mode, under normal conditions where there is no storm, no flood water will be diverted into the system.
Mode 2 When the second mode is activated, flood water is diverted into the bypass tunnel underneath the motorway tunnel. The motorway section is still open to traffic at this stage.
Mode 3 When the third mode is in operation, the motorway will be closed to all traffic.
Mode 4 After making sure all vehicles have exited the motorway, automated water-tight gates will be opened to allow flood waters to pass through.
Reopening to traffic After the flood has ended, the tunnel is verified and cleaned via pressure-washing, and the motorway will be reopened to traffic within 48 hours of closure.
Technical specifications
Stormwater tunnel Construction cost: RM1,887 million (US$514.6 million) Stormwater tunnel length: Diameter: 13.2 m (43.3 ft) (outer diameter) Tunnelling method: tunnel boring machine (TBM) TBM type: slurry shield
Motorway tunnel Motorway tunnel length: Structure type: double deck Ingress and egress: at Jalan Sultan Ismail and Jalan Imbi Length: at Jalan Tun Razak Links: at Kuala Lumpur–Seremban Expressway Links: City Centre near Kg. Pandan Roundabout KL–Seremban Expressway near Sungai Besi Airport
Features
World's first dual-function tunnel (stormwater management & road) Longest tunnel in Malaysia 9.7 km (6.03 miles) stormwater by-pass tunnel 4 km (2.49 miles) double-deck motorway within stormwater tunnel The motorway tunnel is suitable for light vehicles only. Motorcycles and heavy vehicles are not allowed Ingress and egress connections to the motorway tunnel linking the southern gateway to the city centre Holding basin complete with diversion and tunnel intake structures Storage reservoir and a twin-box culvert to release flood discharge State-of-the-art operations control room equipped with the latest systems in operations management, surveillance and maintenance of the SMART system. Custom-made fire engine units consisting of two modified Toyota Hilux pickup trucks, parked at two different locations for quick access to the tunnel in case of fire on both carriageways.Custom-Built Fire Engines for SMART Highway Delivered to the Malaysian Fire and Rescue Department - from SMART Tunnel official website
Tolls The SMART Tunnel utilizes an open toll system. Ever since its operation, all toll transactions at this toll plaza are carried out using Touch 'n Go cards, MyRFIDs or SmartTAGs. Cash payments are not accepted.
Toll rates ClassType of vehiclesRate(in Malaysian ringgit (RM))Notes1Private Cars(Vehicles with two axles and three or four wheels and not exceeding 2.4 metres in height)3.00rowspan=2 2Vans and other small goods vehicles(Vehicles with two axles and three or four wheels and not exceeding 2.4 metres in height)4Taxis(Vehicles with two axles and three or four wheels and not exceeding 2.4 metres in height)Toll charges are paid by passengers using Touch 'n Go cards only.
FM radio channels available RadioFrequenciesNasional FM87.7 MHzBFM 89.989.9 MHzTraXX FM100.1 MHzIKIMfm91.5 MHzHitz92.9 MHzBernama Radio93.9 MHzRadio Klasik95.3 MHzFly FM95.8 MHzKL FM97.2 MHzHot FM97.6 MHz988 FM98.8 MHzKool 101101.3 MHzEra103.3 MHzSuria105.3 MHz
Interchange lists The entire expressway had its speed limit of 60 km/h, maximum height 2 m and located in Federal Territory of Kuala Lumpur.
kmExitSectionsNameDestinationsNotesThrough to 0.0–Dry–T/PSMART toll plaza 3801Motorway TunnelTunnel exit south bound3801A SMART Tunnel Operation Office – Cheras, Petaling Jaya, Shah Alam3801B – KL Sports City, Klang – Kuala Lumpur International Airport (KLIA), Seremban, Malacca, Johor BahruTunnel InterchangeWetMotorway TunnelWet sections3802DryMotorway TunnelTunnel exit north bound3802ASultan Ismail Link Tunnel (Jalan Davis-Kuala Lumpur Inner Ring Road) – Jalan Imbi, Jalan Sultan Ismail, Jalan Bukit Bintang3802BKuala Lumpur Middle Ring Road 1-Jalan Tun Razak (Jalan Pekeliling) – Kuala Lumpur City Centre (KLCC), AmpangTunnel InterchangeLower floorThrough to Kuala Lumpur Middle Ring Road 1
In popular culture The tunnel was featured in the below series: Season 4, Episode 2, of Extreme Engineering, titled "MegaTunnel", on the Discovery Channel. An episode of Truly Malaysia on the National Geographic Channel and TV1. Season 2, Episode 3, of Man Made Marvels, titled "Kuala Lumpur: Flood Control", on the Science Channel. Season 4, Episode 2, of Megastructures on the National Geographic Channel and TV1. Season 1, Episode 2 of Build It Bigger on the Science Channel. The tunnel is also featured in the 2nd film of Ejen Ali. Chapter 6 of "KL Tower of Terror", a novel by Nayli Nasran.