The Chicago Aurora and Elgin Railroad (CA&E), known colloquially as the "Roarin' Elgin" or the "Great Third Rail", was an interurban railroad that operated passenger and freight service on its line between Chicago and Aurora, Batavia, Geneva, St. Charles, and Elgin, Illinois. The railroad also operated a small branch to Mt. Carmel Cemetery in Hillside and owned a branch line to Westchester.
Wounded by the increased use of automobiles after World War II, the CA&E abruptly ended passenger service in 1957. Freight service was suspended in 1959, and the railroad was officially abandoned in 1961. Most of the right-of-way has since been converted to the Illinois Prairie Path rail trail.
The Aurora Elgin and Chicago Railway Origin (1899–1901) The first known attempt to create an electric railway between the metropolis of Chicago and the Fox Valley settlement of Aurora was in late 1891. By this time, passengers in Aurora and Elgin were served by steam railways. Elgin was served by the Milwaukee Road, Geneva and West Chicago served by the Chicago and North Western Railway, St. Charles served by the Chicago Great Western, and Aurora was served by the Chicago, Burlington and Quincy (CB&Q). However, it was thought that an electric line would greatly facilitate interurban travel, as there would be no freight trains to slow passenger trains. A group of investors founded the Chicago & Aurora Interurban Railway with a $1 million investment. However, the railroad was unable to secure additional funds; it failed to meet an 1893 construction deadline and effectively ceased operation thereafter. A second attempt came two years later with the Chicago, Elgin & Aurora Electric Railway. Plans called for the railroad to run through Turner (now West Chicago), Wheaton, and Glen Ellyn. Like its predecessor, the railroad failed to acquire the necessary funds for construction. Yet another group incorporated the DuPage Interurban Electric Railway in 1897, but was met with a similar fate. Small electric lines opened in the 1890s that connected the municipalities of the Fox River Valley. A profitable streetcar railway stretched from Aurora north to Carpentersville. The success of this railway inspired investors to again attempt an electric connection to Chicago. A group led by F. Mahler, E. W. Moore, Henry A. Everett, Edward Dickinson, and Elmer Barrett formed independent railway lines that were projected to stretch from Aurora and Elgin to Chicago. These two companies were incorporated on February 24, 1899. The Everett-Moore group was Ohio's largest interurban railroad company and had experience administrating several lines around Cleveland, most notably the Lake Shore Electric Railway. These two companies, the Aurora, Wheaton & Chicago Railway and Elgin & Chicago Railway, were incorporated on February 24, 1899.
Only one day after their founding, a second group of Cleveland-based investors, led by the Pomeroy-Mandelbaum group, incorporated the Aurora, Wheaton, & Chicago Railroad Company. Pomeroy-Mandelbaum was the second largest interurban railway company in Ohio and intended to compete against the Everett-Moore group. A meeting between the Everett-Moore syndicate and Pomeroy-Mandelbaum group occurred in either 1900 or 1901 to discuss the future of the two companies. They came to an agreement: Everett-Moore would build and maintain the railways connecting Aurora to Chicago while the Pomeroy-Mandelbaum group would control railways linking cities in the Fox River Valley (eventually consolidating as the Aurora, Elgin and Fox River Electric Company [AE&FRE]). A third railway, the Batavia & Eastern Railway Company, was incorporated by the Everett-Moore group in 1901 to link the town of Batavia to the Aurora line. On March 12, 1901, all of the previously incorporated Everett-Moore companies were merged into one, renamed the Aurora, Elgin & Chicago Railway Company (AE&C). Three million dollars' worth of bonds were issued in 1901 to support track construction.
Construction (1901–1902) Construction commenced on September 18, 1900, when the AE&C started to grade its right-of-way. The AE&C received permission to cross existing track lines in February 1902, alleviating one of the largest obstacles in the railway's construction. Construction escalated following the winter months; by April, the third rail had been completed between Aurora and Wheaton. Later that month, the railway connected to the Metropolitan West Side Elevated Railroad at 52nd Avenue (modern day Laramie Avenue) in Chicago. The company operated steam locomotives on completed portions to deliver construction goods to where they were needed. Wheaton was selected as the site of the railroad's headquarters, car barn, and machine shop. $1.5 million in preferred stock was issued in April 1902 to cover unexpected costs.
AE&C purchased a lot south of Batavia and constructed a power station to provide electricity. Commercial electric power was not yet available at the time, so the railroad needed to provide its own power for the third rail. Steam boilers were fed with coal provided by the Chicago, Burlington & Quincy Railroad. On April 11, 1902, they signed a contract with General Electric to provide electrical generators, transformers, and converters for the powerhouse. The line completed a network of utility poles through the right-of-way, allowing communication and power exchange between electrical substations along the track in Aurora, Warrenville, and Lombard. A fifth station was built southeast of Wayne for the Elgin branch. The substations converted the alternating current in the power lines to a lower-voltage direct current for use in the third rail. After its completion, the power station also provided power for at least three small trolley lines and several Fox Valley communities.
The Cleveland Construction Company was hired to build the line. All three rails were traditional "T" design rails laid on stone ballast. Wooden railroad ties were laid 2,816 ties to the mile and separated at standard gauge. Every fifth tie was long to support the third rail. The majority of the line was a double track, with a single track running from the Chicago Golf Club to Aurora. Roadbeds for the double track were wide and were surrounded by woven wire fencing. The third rail was usually placed on the inner sides of the double track, providing safety for residents and employees. The third rail was interrupted at railroad crossings, where a cable was placed underground to carry the current across the gap.
The first inspection trip of the line was held on May 16, 1902. the train departed from 52nd Avenue to Aurora, then traversed the AE&FRE south to Yorkville then north to Dundee. AE&C management announced later that evening that they planned on opening the line on July 1. The AE&FRE announced soon afterward that it would offer express transfer service from Fox Valley communities to the AE&C. On May 17, the AE&C tested the powerhouse in Batavia and found several problems with its performance. Heavy rains in June stalled construction and washed out some completed roadbed. The opening date was pushed to July 12, but delays in rolling stock production further stalled it to August.
Poor investments forced the Everett-Moore syndicate to sell its shares in the AE&C in mid-1902. The company had formed a telephone company, but struggled to compete with the Bell Telephone Company. In addition, one of their construction companies went bankrupt, spurring a credit crisis in Cleveland. Creditors demanded pay, and the Everett-Moore group sold off several assets, including their shares of the railroad company totaling $200,000. The Pomeroy-Mandelbaum group still held a large share in the company and became leaders in its operation.
The G. C. Kuhlman Car Company was tasked with providing thirty passenger cars but, for unknown reasons, the deal fell through. An order was placed with the Niles Car and Manufacturing Company in March 1902 for ten cars. Niles Cars were in such high demand that the company was unable to fulfill the full order, but did deliver the AE&C's first six cars on July 29, 1902. The cars were with four motors and wheels. They were described as "miniature Pullmans" and could seat forty-six or fifty-two passengers. Another twenty cars were ordered from the John Stephenson Car Company and would arrive after the railway was opened.
One final problem for the AE&C was finding enough qualified motormen to run the trains. The company found none in the immediate area and had to recruit sixteen men from Dayton, Ohio. Another inspection tour occurred on August 4, from Wheaton to 52nd Avenue. A Niles Car was pulled by a steam locomotive along the track to ensure that none of the curves were too sharp for the intended rolling stock. Original plans called for the third rail to guide the car, but the company experienced many electrical problems along its power lines. By the time the third rail was functioning properly, two hundred and fifty utility poles had burned to the ground due to faulty insulators. A final inspection took place on August 21 from Wheaton to Elmhurst. Although problems with the utility poles were noted, the inspection was otherwise considered a success. For the next three days, engineers tested the line from Aurora to Wheaton so that they would have a familiarity with the track.
Early service
Despite a malfunctioning power system, a group of nearly-untrained motormen, and only six pieces of operational rolling stock, the Aurora branch of the Chicago Aurora and Elgin Railroad opened on August 25, 1902. Fares were 25 cents one-way and 45 cents round-trip. Passengers who wanted to enter The Loop had to transfer to the Metropolitan West Side Elevated at 52nd Avenue for an additional five cents. Service began at 5:33 am and concluded at 11:33 pm, with trains running every thirty minutes. Terminals were opened to the public at 52nd Avenue, Austin Avenue (in Chicago), Oak Park, Harlem Avenue (in Forest Park), Maywood, Bellwood, Wolf Road (in Hillside), South Elmhurst, Secker Road (in Villa Park), Lombard, Glen Ellyn, College Avenue (in Wheaton), Wheaton, Gary Road (in Wheaton), Chicago Golf Grounds, Warrenville, Ferry Road (in Warrenville), Eola Junction (in Aurora), and Aurora. A one-way trip from Aurora to Chicago was seventy-five minutes. The final four cars from the Niles Car Company arrived on September 5 and were put into service seven days later. The original train schedules posted at stations showed service on the Batavia branch. However, actual service did not begin until the last week of September 1902. The Batavia branch met the Aurora branch at Eola Junction. Even when opened, the Batavia branch experienced little traffic and may have been primarily used as convenient transport for railroad officials to the Batavia powerhouse.
The AE&C issued promotional leaflets to citizens of Fox Valley cities and towns. They also sent these pamphlets to settlements west of Aurora, hoping that people would take a steam train to Aurora and then transfer to the electric line. They boasted that the AE&C was the "finest electric railroad in the world." By the end of the year, the AE&C was seeing monthly earnings in excess of $16,500. In addition, the nearby Chicago, Burlington and Quincy Railroad had a dramatic decrease of passengers between Aurora and Chicago.
The twenty cars from Stephenson arrived in December 1902. Fifteen cars were equipped with motors (even numbers 30–58) and five did not (odd numbers 101–109); these latter five cars were intended to only be used as trailing cars. Trailing cars would often be added or removed at Wheaton depending on the number of passengers. The Stephenson cars were almost identical in every respect to the Niles cars. These new cars reduced the travel time between Aurora and Chicago to one hour. The new cars also allowed the railroad to operate at faster speeds—one run from 52nd Avenue to Aurora averaged .