Line 6 of the Changsha Metro () is a rapid transit line in Changsha, Hunan, China. The line opened on 28 June 2022, running with 34 stations.. This is the first line of Changsha Metro system operating under PPP contract with 25-year tenure.

History Construction started on 28 December 2016 with estimated investment of 38.84 billion RMB. Test operations without passengers started in December 2021. Phase 1 of Line 6 opened on 28 June 2022.

Opening timeline SegmentCommencementLengthStation(s)NameXiejiaqiao — Huanghua Airport T1 & T228 June 202234Phase 1

Rolling stock The line is operated using six-car Type A trains manufactured by CRRC Zhuzhou Locomotive, with a capacity for 2592 passengers. The maximum service speed of the trains is 80 km/h.

Stations Section Station name Connections Distance Location Phase 1 CSX East extension CSX

References

External links