Line 3 of Jinan Metro () is a rapid transit line in Jinan, China. The line use six-car Type B rolling stock. The line is long. It is completely underground.
Phase 1 of Line 3 was opened on 28 December 2019. Phase 2 of Line 3 opened on 22 November 2024 (Jichangbei station is still under construction).
Timeline SegmentOpenedLengthStation(s)Name Longdong — Tantou 28 December 2019 12 Phase 1Peijiaying25 October 2023n/a1infill stationTantou — Jichangnan22 November 20245 Phase 2Jichangnan — Jichangbei2027 or 2028 (U/C)1
Stations Services Station Name Connections DistanceDistrictLocalRapid ·△ 0Lixia·| ·| ·△ ·| ·△ ·| ·△ ·| Licheng·△ ·| ·▲OSI: MDK ·| ·| ·| ·| ·| ·▲ 33.675 (U/C) 34.328
Notes
References