The LRTA 2000 class is a class of electric multiple units in operation on Manila's LRT Line 2, manufactured by Rotem and Toshiba.
A total of seventy-two cars configurable to eighteen train sets were manufactured from 2002 to 2003 under the fourth package contract of the initial construction of Line 2.
History Purchase and production The project's fourth package, which involved communications and fare systems, vehicles, and trackwork, had eight consortia submit bids in July 1997. The selected firms included: Sumitomo in partnership with GEC Alsthom (now Alstom), Alcatel, Barclays, and Meidensha Corporation; MMC Consortium made up of Mitsubishi Heavy Industries, Mitsubishi Corporation, and Hyundai Presicion (which later merged to become Rotem and was renamed Hyundai Rotem), with John Holland, Mitsubishi Electric, and Union Switch & Signal as subcontractors; CCDET Consortium consisting of Spanish companies Construcciones y Auxiliar de Ferrocarriles, Elecnor, Curbertas y MZOV (now Acciona), Dimetronic, and Tomen as subcontractors; USJP Consortium consisting of Nissho Iwai (now Sojitz Corporation), Raytheon Ebasco Overseas, General Railway Signal, and Nippon Sharyo; Kanemastu Corporation and Ansaldo SPA (now Hitachi Rail Italy) consortium with subcontractors Breda Construzioni, Hanjin Heavy Industries (later merged to become Rotem and renamed Hyundai Rotem) and Spie Entrans SA; Siemens/Mitsui consortium with Marta Transport as subcontractors; Asia-Europe MRT Consortium (AEMC) comprising Marubeni, Balfour Beatty, Toshiba, and Daewoo Heavy Industries (which later merged to form Rotem and was renamed Hyundai Rotem), with subcontractors GPT International and GEC Alsthom; and Adtranz, ABB Power, and Itochu Corporation consortium.
According to Senator Juan Ponce Enrile, the bidding was hounded with alleged anomalies. Although it was promptly corrected by the Estrada administration after it assumed power in the middle of that year, it also encountered similar anomalies in May 2000, such as the disqualification of two bidders in the final evaluation. Only Ansaldo and Siemens/Mitsui passed the technical evaluation process. Finally, AEMC secured the contract in September 2000, winning over MMC Consortium's bid.
Seventy-two train cars (18 sets) were produced by Rotem (now Hyundai Rotem) between 2002 and 2003. These were built in Uiwang, Gyeonggi-do, South Korea. Hyundai Rotem constructed the main car body while Toshiba provided the electric components. The first four train sets arrived in November 2002, while the remaining fourteen were delivered in the succeeding months.
Mainline operations By 2014, twelve out of the eighteen sets remained in service. By May 2019, it was reduced to eight following a collision involving two train sets, and by October, further reduced to five following a power supply incident. By July 2021, running trains were increased to six after the opening of the east extension, subsequently increased to eight. Currently, eight trains are operational, while the other trains are being cannibalized for spare parts.
Upgrades On April 16, 2018, the Light Rail Transit Authority signed a contract with Multi-Scan Corporation and MRail, Inc. for the replacement of 80 air-conditioning units in ten train sets. It used parts from the original equipment manufacturer of the air-conditioning units, Carrier Corporation. The replacement of air-conditioning units started on March 7, 2019, and was completed the following May 24.
Rehabilitation of three trains started on March 3, 2021. AMSCO JV, the then-maintenance provider of Line 2, started the installation of new train propulsion systems and train monitoring systems from Woojin Industrial Systems in three trains in order for those to return to service ahead of the original scheduled opening of the east extension the following April. The refurbishment was completed in the same year.
Design
Car body
The car body is made of stainless steel, and the under frame shares the similar material with LAHT steel. The trains sport a livery of yellow and purple cheatlines. The upper yellow lines represent mango, the unofficial national fruit, while the thicker purple lines are based from the ube, sporting a geometric ethnic design.
The trains have round front ends, which bears resemblance to the second-generation Korail Class 311000 (Seoul Subway Line 1), 341000 (Seoul Subway Line 4), and 351000 (Suin–Bundang Line); these EMUs are also manufactured by Rotem (or then KOROS).
Each car has two roof-mounted air-conditioning units manufactured by Carrier with a cooling capacity of per hour. In total, there are eight air-conditioning units in a single train set.
Trains prominently use wrap advertising. All the currently active train sets feature upgraded front destination signs, now in LED, instead of sign scrolls, of which the latter only its sides remained intact, albelt no longer used.
Interior The inner train space is lined with melamine and/or polyester faced ply metal. The windows are tinted safety glass, and the longitudinal seats are made of fiberglass reinforced plastics. The seats have a length of . The flooring is of stainless steel keystone plate and a thick, nonslip covering. Open gangways are present in between cars with a width of .
In 2017, some trains were retrofitted with the Passenger Assist Railway Display System (now known as TUBE), a passenger information system powered by LCD screens installed near the inner ceiling of the trains that shows news, advertisements, current train location, arrivals and station layouts. However, as of 2022, the LCD screens remain switched off and unutilized.
Electrical and mechanical Each car has two bolsterless bogies underneath the car with an axle length of . The primary suspension consists of an elastomeric spring and the secondary suspension is a diaphragm air spring. Mechanical Shibata couplers are present at the ends of the driver cabs, along with anti-climbers above it. Semi-permanent couplers are present in between cars (non-cab ends).
The traction system consists of VVVF inverters controlled by IGBT semiconductors. Two alternating current induction motors with a power output of are mounted on each bogie. Toshiba supplied the original VVVF controller and propulsion systems, while Woojin Industrial Systems supplied the new propulsion systems for three train sets. Its auxiliaries consist of 3,300-volt static inverters and 110-volt DC batteries.
Train formation The configuration of a four-car trainset is Mc1–M1–M2–Mc2. All cars are powered and equipped with traction motors; Mc denotes a driving car while M denotes an intermediate car.
+Cars of 2000 classCar typeMcMQuantity2Control cab Motor VVVF inverter Pantograph Car lengthm23.3ft in Capacity Seated 54 64 Standing 338 360 Total 392 422
Fleet list Set No. 1 2 3 4 Status 1 2001 2002 2003 2004 Active 2 2005 2006 2007 2008 No plans to repair 3 2009 2010 2011 2060 Active 4 2013 2014 2015 2016 5 2017 2018 2019 2020 No plans to repair 6 2021 2022 2023 2024 7 2025 2026 2027 2012 No plans to repair 8 2029 2030 2031 2032 Active 9 2033 2034 2035 2036 10 2037 2038 2039 2056 No plans to repair 11 2041 2042 2043 2044 No plans to repair 12 2045 2046 2047 2048 No plans to repair 13 2049 2050 2051 2052 Active 14 2053 2054 2055 2040 15 2057 2058 2059 2028 No plans to repair 16 2061 2062 2063 2064 Active 17 2065 2066 2067 2068 18 2069 2070 2071 2072*
Current Car 2072, and 2049 was formerly 2048 and 2045 of Trainset 12, replaced after the 2019 Accident
Incidents On May 18, 2019, two trains collided between and , injuring 34 passengers with none in critical condition. The incident started at 2:09 p.m. when trainset no. 13 broke down at Katipunan station after the train's static inverters, which powers the electrical and braking systems, failed. The defective train was subsequently moved to the pocket track near Anonas station, waiting to be towed back to the depot. However at 9:15 p.m., the train was reported to have moved on its own towards the eastbound track going towards Santolan station, after its air pressure slowly dissipated, causing the brake shoes of train no. 13 to loosen. The downward slope of the pocket track also caused the train to move on its own. At this time, trainset no. 18 was going towards Santolan station from Araneta Center-Cubao on the same track. The runaway train was reported via radio but eventually rear-ended train no. 13. The driver of one of the two trains was reported to have jumped out of his train before the collision, sustaining wounds and bruises. Revenue operations were suspended to give way for maintenance checks; operations resumed at 10:47 a.m. the next day. Both trains involved were subsequently repaired and returned to service in September 2021. On September 15, 2025, around 11:00pm, a 2000 class train derailed whilst arriving at Santolan station, causing damage to both train and the tracks which resulted in limited operations between Recto station and Araneta Center–Cubao station the following day, before it resumed full operations at 7:30am.
See also
Korail Class 311000 Korail Class 341000 Korail Class 351000 LRTA 1100 class PNR Hyundai Rotem DMU
Notes
References
Sources