Edmonton Light Rail Transit, commonly referred to as the LRT, is a 29 station light rail system in Edmonton, Alberta. Part of the Edmonton Transit Service (ETS), the 21-kilometre Capital Line starts at Clareview in Edmonton's northeast and ends at Century Park in Edmonton's south end. A second route, the Metro Line to areas north of the downtown, opened on September 6, 2015. The Metro Line includes a extension in the LRT system from Churchill LRT Station in downtown Edmonton northwest to NAIT/Blatchford Market Station.

Lines and stations Capital Line15 stations Metro Line 10 stations (7 shared with Capital Line) Valley Line 12 stations

Station/Stop Line Opened Average daily boardings Grade Parking spaces 2023At-grade 2023At-grade 1983 Underground 1978 Surface 2023At-grade 1978 Underground 2010 Surface 1978 (underground)2023 (surface)Underground and at-grade 1981 Surface 1978 Surface 1983 Underground 2023Elevated 1989 Underground 2023At-grade 2006 Surface 2023At-grade 2015 Surface 2015 Surface 2009 Surface 2023At-grade 2023At-grade 2023At-grade 2015 (original)2024 (relocated) Surface 2023At-grade 2009 Surface 2010 Surface 1978 Surface 2023At-grade 1992 Underground

References