Line 4 of the Hangzhou Metro () is a rapid transit line in Hangzhou. It is colored green on maps.
Description Phase 1 Phase 1 of the line started operation since 2015. Running northeast–southwest, the line connects Hangzhou East railway station, Qianjiang New City and Binjiang District. Part of the line ( to Shuicheng Bridge) runs along the north bank of Qiantang River.
Phase 2 The second phase of Line 4 is in length. This extension was opened on 21 February 2022.
Opening timeline SegmentCommencementLengthStation(s)Name Pengbu — Jinjiang 2 February 2015 9 Phase 1 (initial section) Xintang 28 June 2015 Infill station 1 Jinjiang — Puyan 9 January 2018 7 Phase 1 (final section) Lianzhuang 6 June 2018 Infill station 1 Pengbu — Chihua Street 21 February 2022 14Phase 2 (exclude Ducheng Ecopark Station)Ducheng Ecopark26 July 2025Infill station1
Stations Legend - Operational - Under construction
Section Station name Connections Distance Location Phase 3 south ext. -Xiaoshan1.0201.6380.939Binjiang Phase 11.357Shangcheng Phase 224.4201.3461.17328.9391.71328.652Gongshu2.15630.8081.75032.5581.46534.0231.3261.8501.39038.5901.30939.900Yuhang1.33341.2301.57442.8122.18744.9991.74646.745Xihu Phase 3 west ext.1.7421.1601.2650.954
Rolling stock Stock Class Year built Builder Number built Numbers Formation Depots Line assigned Notes PM082 B 2013-2015 CSR Nanjing Puzhen 174 (29 sets) 04 001 - 04 029 (040011-040296) Tc+Mp+M+M+Mp+Tc Gouzhuang YardQibao Depot PM174 2020-2022 CRRC Nanjing Puzhen 192 (32 sets) 04 030 - 04 061 (040301-040616)
See also Hangzhou Metro
References