Line 3 of the Harbin Metro () is a rapid transit ring line in Harbin.

History Phase 1 The first phase of the line, from to , commenced operations on 26 January 2017. It is 5.45 km long with 5 stations, all of which are underground.

Harbindajie station opened as an infill station on June 16, 2017. Harbindajie station renamed to station on March 20, 2019.

Phase 2 (initial section) The section from to , and the section from to opened on November 26, 2021.

Phase 2 (remaining section) The remaining section, comprising 9 stations, opened on 25 November 2024.

Opening timeline SegmentCommencementLengthStation(s)Name — 26 January 2017 3 Phase 1 16 June 2017 infill station 1 — 26 November 2021 15 Phase 2 (southeast section) — 5 — 29 September 2023 3Phase 2 (northwest section) — 26 December 2023 1 — 25 November 2024 9

Stations

Legend - Stations in operation - Under construction, opening in 2023 & 2024

Station name Connections Distance Location Daoli VABNangangXiangfangNangangDaowaiDaoli

Notes

Rolling stock Services on the line are provided by six-car Type B trains, which have a total capacity of 1440. These trains are the same as those which run on Line 1.

References