The Berlin U-Bahn (; short for , "underground railway") is an electric rapid transit system in Berlin, the capital and largest city of Germany, and a major part of the city's public transport system. Together with the S-Bahn, a network of suburban train lines, a bus network, and a tram network that operates mostly in the eastern parts of the city, it serves as the main means of transport in the capital.

Opened in 1902, the serves 175 stations spread across nine lines, with a total track length of ,BVG-Zahlenspiegel-2021 about 80% of which is underground. Trains run every two to five minutes during peak hours, every five minutes for the rest of the day and every ten minutes in the evening. Over the course of a year, U-Bahn trains travel , and carry over 500 million passengers. In 2024, 554.3 million passengers rode the U-Bahn. The entire system is maintained and operated by the , commonly known as the BVG.

Designed to alleviate traffic flowing into and out of central Berlin, the U-Bahn was rapidly expanded until the city was divided into East and West Berlin at the end of World War II. Although the system remained open to residents of both sides at first, the construction of the Berlin Wall and the subsequent restrictions imposed by East Germany limited travel across the border. The East Berlin U-Bahn lines from West Berlin were severed, except for two West Berlin lines that ran through East Berlin (U6 and U8). These were allowed to pass through East Berlin without stopping at any of the stations, which were closed. Friedrichstraße was the exception because it was used as a transfer point between U6 and the West Berlin S-Bahn system, and a border crossing into East Berlin. The system was reopened completely following the fall of the Berlin Wall and German reunification.

The Berlin U-Bahn is the most extensive underground network in Germany. In 2006, travel on the Berlin U-Bahn was equivalent to 122.2 million km (76 million mi) of car journeys.

History

The Berlin U-Bahn was built in three major phases: Up to 1913: the construction of the (small profile) network in Berlin, Charlottenburg, Schöneberg, and Wilmersdorf; Up to 1930: the introduction of the (large profile) network that established the first north–south lines; From 1953 on: further development after World War II.

In a bid to secure its own improvement, Schöneberg also wanted a connection to Berlin. The elevated railway company did not believe such a line would be profitable, so the city built the first locally financed underground in Germany (intentionally using standard of Berlin U-Bahn rolling stock). It was opened on 1 December 1910. Just a few months earlier, work began on a fourth line to link Wilmersdorf in the southwest to the growing Berlin U-Bahn.

The early network ran mostly east to west, connecting the richer areas in and around Berlin, as these routes had been deemed the most profitable. In order to open up the network to more of the workers of Berlin, the city wanted north–south lines to be established. In 1920, the surrounding areas were annexed to form Groß-Berlin ("Greater Berlin Act"), removing the need for many negotiations, and giving the city much greater bargaining power over the private ("elevated railway company"). The city also mandated that new lines would use wider carriages—running on the same, standard-gauge track—to provide greater passenger capacity; these became known as the Großprofil ("large profile") network.

Construction of the ("North-South railway") connecting Wedding in the north to Tempelhof and Neukölln in the south had started in December 1912, but halted for the First World War. Work resumed in 1919, although the money shortage caused by hyperinflation slowed progress considerably. On 30 January 1923, the first section opened between Hallesches Tor and Stettiner Bahnhof (Naturkundemuseum), with a continuation to Seestraße following two months later. Desperately underfunded, the new line had to use trains from the old Kleinprofil network; the carriages exits had to be widened to fill the gap to the platforms with wooden boards that passengers jokingly referred to as Blumenbretter ("boards for flower pots"). The line branched at Belle-Alliance-Straße, now (Mehringdamm); the continuation south to Tempelhof opened on 22 December 1929, the branch to Grenzallee on 21 December 1930.

In 1912, plans were approved for AEG to build its own north–south underground line, named the after its termini, Gesundbrunnen and Neukölln, via Alexanderplatz. Financial difficulties stopped the construction in 1919; the liquidation of AEG-Schnellbahn-AG, and Berlin's commitment to the Nord-Süd-Bahn, prevented any further development until 1926. The first section opened on 17 July 1927 between Boddinstraße and Schönleinstraße, with the intermediate Hermannplatz becoming the first station at which passengers could transfer between two different Großprofil lines. The completed route was opened on 18 April 1930. Before control of the U-Bahn network was handed over completely to the BVG in 1929, the Hochbahngesellschaft started construction on a final line that, in contrast to its previous lines, was built as part of the Großprofil network. The major development was stopped in 1930.

The seizure of power by the Nazi Party brought many changes that affected Germany, including the U-Bahn. Most notably, the new national flag was hung in every station, and two of the stations were renamed. Extensive plans—mostly the work of architect Albert Speer—were drawn up that included the construction of a circular line crossing the established U-Bahn lines, and new lines or extensions to many outlying districts. Despite such grand plans, no U-Bahn development occurred. In the Nazi period the only addition to Berlin's underground railways was North–South Tunnel of S-Bahn, opened 1936–1939.

During the Second World War, U-Bahn travel soared as car use fell, and many of the underground stations were used as air-raid shelters; however, Allied bombs damaged or destroyed large parts of the U-Bahn system. Although the damage was usually repaired fairly quickly, the reconstructions became more difficult as the war went on. Eventually, on 25 April 1945, the whole system ground to a halt when the power station supplying the network failed. Upon unconditional surrender of Nazi Germany following the Battle for Berlin there were 437 damaged points and 496 damaged vehicles.

The war had damaged or destroyed much of the network; however, of track and 93 stations were in use by the end of 1945, and the reconstruction was completed in 1950. Nevertheless, the consequent division of Berlin into East and West sectors brought further changes to the U-Bahn. Although the network spanned all sectors, and residents had freedom of movement, West Berliners increasingly avoided the Soviet sector and, from 1953, loudspeakers on the trains gave warnings when approaching the border, where passage of East Germans into the Western sectors also became subject to restrictions imposed by their government. There was a general strike on 17 June 1953 which closed the sections of the Berlin U-Bahn that traveled through East Berlin. Just after the strike, on the following day, train service on the line A was resumed and the service C was resumed to provide connections to Nordbahnhof and Friedrichstraße.

Between 1953 and 1955, the 200-Kilometre-Plan was drawn up, detailing the future development of the U-Bahn, which would grow to . Extending the C line to run from Tegel to Alt-Mariendorf was considered the highest priority: the northern extension to Tegel was opened on 31 May 1958. In order to circumvent East Berlin, and provide rapid-transport connections to the densely populated areas in Steglitz, Wedding, and Reinickendorf, a third north–south line was needed. The first section of line G was built between Leopoldplatz and Spichernstraße, with the intention of extending it at both ends. It had been planned to open the G line on 2 September 1961, but an earlier opening on 28 August was forced by the announcement of the construction of the Berlin Wall.

The next crisis was followed by the Berlin Wall construction on 13 August 1961, which had split the city between east and west. The U2 was split into two sections, and for the north–south lines, trains were not allowed to stop for passengers and become Geisterbahnhöfe ("ghost stations"), patrolled by armed East German border guards. Only at Friedrichstraße, a designated border crossing point, were passengers allowed to disembark. A further consequence over the years is that most of the Berlin S-Bahn passengers boycotted the Deutsche Reichsbahn, and transferred to the U-Bahn with numerous expansion.

From 9 November 1989, following months of unrest, the travel restrictions placed upon East Germans were lifted. Tens of thousands of East Berliners heard the statement live on television and flooded the border checkpoints, demanding entry into West Berlin. Jannowitzbrücke, a former ghost station, was reopened two days later as an additional crossing point. It was the first station to be reopened after the opening of the Berlin Wall. Other stations, Rosenthaler Platz and Bernauer Straße on the U8 soon followed suit; and by 1 July 1990, all border controls were removed. In the decade following reunification, only three short extensions were made to U-Bahn lines.

In the 1990s some stations in the eastern portion of the city still sported bullet-riddled tiles at their entrances, a result of World War II battle damage during the Battle of Berlin. These were removed by 21 December 2004.

U-Bahn network

Routes

The U-Bahn has nine lines:

Line Route Opened Length Stations Color Uhlandstraße – Warschauer Straße 1902–1926 13 RAL 6018 Pankow – Ruhleben 1902–2000 29 RAL 2002 Krumme Lanke – Warschauer Straße 1902–1929 24 RAL 6016 Nollendorfplatz – Innsbrucker Platz 1910 5 RAL 1023 Hauptbahnhof – Hönow 1930–2020 26 RAL 8007 Alt-Tegel – Alt-Mariendorf 1923–1966 29 RAL 4005 Rathaus Spandau – Rudow 1924–1984 40 RAL 5012 Wittenau – Hermannstraße 1927–1996 24 RAL 5010 Rathaus Steglitz – Osloer Straße 1961–1976 18 RAL 2003

Stations

Among Berlin's 170 U-Bahn stations there are many with especially striking architecture or unusual design characteristics:

Hermannplatz station resembles something of a U-Bahn cathedral. The platform area is high, long and wide. It was built in connection with the construction of the first North-South Line (Nord-Süd-Bahn), now the U8. The architecturally important department store Karstadt adjacent to the station, was being constructed at the same time. Karstadt contributed a large sum of money towards the decoration of the station and was in return rewarded with direct access from the station to the store. Hermannplatz was also the first U-Bahn station in Berlin to be equipped with escalators. Today, Hermannplatz is a busy interchange between the U7 and U8.

Alexanderplatz station is another of the more notable U-Bahn stations in Berlin, and is an important interchange between three lines (U2, U5 and U8). The first part of the station was opened in 1913 along with an extension of today's U2 line. In the 1920s Alexanderplatz was completely redesigned, both above and below ground. The U-Bahn station was expanded to provide access to the new D (today's U8) and E (today's U5) lines, then under construction. The result was a station with a restrained blue-grey tiled colour-scheme and Berlin's first underground shopping facilities, designed by Alfred Grenander. Over the last few years Alexanderplatz station has, in stages, been restored; the work was due to be finished in 2007.