Gangcheng Road () is a Shanghai Metro interchange station in Pudong, Shanghai, located at the intersection of Gangcheng Road and North Zhangyang Road. It is served by Lines 6 and 10. On Line 6, it is the northern terminus of the line. On Line 10, it is located between and stations. It began operations on 29 December 2007, with the opening of Line 6. It became an interchange station with the opening of the second phase of Line 10. The extension was expected to open in 2018,沪轨交10号线二期或2018年开通 通到这些盘 (Shanghai Metro Line 10 Second Phase expected to open in 2018.) however, due to construction delays, it finally opened on 26 December 2020.

The station is located near the Waigaoqiao section of the Shanghai Free-Trade Zone (formerly the Shanghai Waigaoqiao Free Trade Zone). However, the adjacent station to the east on Line 10, Jilong Road station, is located within the zone.

Station layout 2FSide platform, doors open on the rightWestbound← towards Hongqiao Railway Station or Hangzhong Road (Gaoqiao)Eastbound towards Jilong Road (Terminus) →Island platform, doors open on the rightNorthbound← termination trackSouthbound towards Oriental Sports Center (North Waigaoqiao Free Trade Zone) →Side platform, doors open on the right1FConcourseExits 1-2, fare gates, station agent

As part of phase two of Line 10, the northern side platform of Line 6 has been converted to an island platform and extended to fit the longer trains on Line 10. An additional side platform was built further to the north. Since the opening of Line 10, this station features a cross-platform interchange between arriving passengers on Line 6 and station-bound passengers on Line 10. It is the only elevated cross-platform interchange on the entire Shanghai Metro network.

References